Skip to content

Silos · feed mills · processing

Work at height for agriculture and the food industry

Grain silos, hoppers, feed mills and processing halls: planned work scheduled around the harvest and the site’s hygiene rules.

What we see in the sector

Banks of steel or concrete silos, elevators and conveyors at height, steel-framed halls with large roofs where dust and birds are a constant problem.

The working window is set by the season: before harvest the silos must be clean and checked, and once the campaign starts a shutdown is no longer an option.

How we fit in

  • We schedule work before or after the harvest campaign
  • We follow the site’s hygiene and access rules
  • Inside silos we only work once the client has isolated the installation
  • We coordinate with the site’s health and safety lead

Typical jobs

  • Pre-harvest silo cleaning

    Old build-up, crusts and blockages at the cone.

  • Corrosion protection

    Touch-ups on steel silos, elevators and gantries.

  • Bird netting

    At intake bays and in the structure of storage halls.

  • Gutters and roofs

    Clearing and sealing on storage and processing halls.

Relevant services

Request for quotation

Give us a short outline of the job. We will come back with technical questions or a proposed site visit, then a written quote.

Fields marked * are required.

The company is not VAT-registered, so our quotes carry no VAT.

Frequently asked questions

When is the best time to book silo cleaning?

A few weeks before harvest, so there is time for any repairs found during cleaning.

Do you work on sites with food safety requirements?

Yes. The site’s rules, including clothing and access, are written into the method statement.

Can you do several silos in one mobilisation?

Yes, and it brings the cost per silo down. We plan them in the order they can be emptied.

Got a job that is hard to reach?

Send us your request and we will come back with the right technical questions.